1, undertake the transmission from the ball milling stage of the inspection standard slurry, from the rotary drum distribution to each molding wet press inside, according to different product models to issue the injection amount command, it is injected into the mold tray.
2, Using the company's independent research and development of magnetic material forming wet press, through manual operation of the controller, automatic pressing press, according to different product specifications, adjust the pressing time, pressure size, output instructions, at this time the press cylinder will operate at the same time to press the slurry molding, excess water through the water hole above the mold, it will be discharged.
3. After pressing and forming, the mold plate ejects emulsion to make it demoulded, and the robot automatically takes the embryo and puts it on the front storage table.
4, the inspectors will be tested at this time, through the appearance of the product, size, stratification and other tests, the standard of the product for the next stage, the cause of the substandard product analysis, recycling.
5, we complete the automation stage, the qualified products will be manually sorted, the pressed permanent magnet ferrite neatly into the embryonic frame, ready to move to the next link.
Above we have completed all the work of the pressing stage, efficient and precise processing technology, and prepared finished products that meet the specifications and requirements. Through the perfect process flow and equipment technology, to ensure the stability of product quality and improve the production efficiency.